Construction Progress–8/23/2021

There is minor work done today, primarily in taking down some of the light panels and coil up some electrical wire tubing.

These are the light panels taken down from the ceiling.

Albert Lin and I are in communication with DRA regarding the demolition plan. The plan calls for the removal of the short wall, in its place DRA needs to replace this wall with a short beam to support the joists (4 to the north, 5 to the south of the wall) which are part of the supporting structure for the 2nd floor slab. DRA is contacting their structural engineer for a site visit.