副堂 講台底座 2×10 at 16″ o.c. served as the support for the stage. There will be sheathing of 3/4″ plywood at top of the stage. The framing for the lift at the left of the stage will be removed to conform to the new stage configuration which DRA has done with green room and the stage of phase 3 sanctuary all included. Location for Steps to stage

