The Middle is the West Wall Framing of the Men’s Room. The Right is the South Wall Framing of the Chapel. (Looking from the Fellowship Area) The South Wall Rough Framing-(Looking from the Chapel area) The Base of the South Wall of the Chapel Lobby. Left of the brown tube column is going to be the future chapel. (The masonry wall as you are seeing at the left is waiting to be removed when the design of the column and beam are done and permitted by the city to install). Right of the brown tube column is going to be the children’s meeting room. The air duct is all to be replaced and rearranged with hard tube and attached to the bottom flange of the roof joist. The Writing “Demo” on the wall signifies that this wall is to be removed and make way for the west wall configuration of the Children’s Meeting Room.
Phase 1 Plan (Up is North)